Warning: define(): Argument #3 ($case_insensitive) is ignored since declaration of case-insensitive constants is no longer supported in /var/www/motioncars/wp-content/themes/Motioncars/includes/theme-js.php on line 3

Warning: define(): Argument #3 ($case_insensitive) is ignored since declaration of case-insensitive constants is no longer supported in /var/www/motioncars/wp-content/themes/Motioncars/includes/theme-js.php on line 5
DOTr inks MOA for construction of LRT-MRT common station | Motioncars
Warning: Undefined variable $hide_ads in /var/www/motioncars/wp-content/themes/Motioncars/tpl2018/header.php on line 69

Warning: Undefined variable $mftag in /var/www/motioncars/global-head.php on line 11

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 11

Warning: Undefined variable $Tabboollaaa_actv in /var/www/motioncars/global-head.php on line 71

Warning: Undefined variable $Tabboollaaa_actv_landing in /var/www/motioncars/global-head.php on line 109

Warning: Undefined variable $is_hp in /var/www/motioncars/global-head.php on line 172

Warning: Undefined variable $disbalepixel in /var/www/motioncars/global-head.php on line 301

Warning: Undefined array key "nl_v3" in /var/www/motioncars/global-head.php on line 487

Warning: Undefined variable $nl_v3_enable in /var/www/motioncars/global-head.php on line 487

Warning: Undefined variable $sources_strips in /var/www/motioncars/global-head.php on line 493

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 505

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 516

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 528

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 540

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 552

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 563

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 573

Warning: Undefined variable $ch in /var/www/motioncars/global-head.php on line 584

Warning: Undefined array key "testslash" in /var/www/motioncars/globalga.php on line 38

Warning: Undefined variable $sources_strips in /var/www/motioncars/globalga.php on line 98

Warning: Undefined variable $special_ads in /var/www/motioncars/globalga.php on line 322

Warning: Undefined variable $special_ads in /var/www/motioncars/globalga.php on line 361

Warning: Undefined variable $sources_strips in /var/www/motioncars/globalga.php on line 364

DOTr inks MOA for construction of LRT-MRT common station


Warning: Undefined variable $banBylineClean in /var/www/motioncars/wp-content/themes/Motioncars/single.php on line 53

Warning: Undefined variable $banSource in /var/www/motioncars/wp-content/themes/Motioncars/single.php on line 53
January 19,2017

Warning: Undefined variable $related in /var/www/motioncars/wp-content/themes/Motioncars/functions.php on line 346
MRT (left) and LRT. INQUIRER FILE PHOTOS

MRT (left) and LRT. INQUIRER FILE PHOTOS

After being stalled for eight years, the common station that would link three of the metro’s rail systems will finally be constructed in December this year.

This comes after the Department of Transportation (DOTr) led Wednesday morning the signing of the memorandum of agreement that would pave the way for the construction of the P2.8-billion common station.

The signing was attended in by officials of DOTr, Department of Public Works and Highways, SM Prime Holdings Inc., Universal LRT Corp. Ltd. of San Miguel Corp., Light Rail Manila Corp., North Triangle Depot Commercial Corp. and Light Rail Transit Authority.

The project was initially slated to be constructed in 2009 near SM North Edsa but faced legal issues with its location. In 2014, the station was supposed to be built by the then Department of Transportation and Communications but was halted by the Supreme Court following SM Prime Holdings contest of the new location, near Ayala’s Trinoma Mall.

In September last year, Transportation Secretary Arthur Tugade gathered the stakeholders of the common station to end the impasse by signing a term sheet which set forth that the structure will be built between SM and Trinoma in Quezon City.

The common station would link the Metro Rail Transit 3, Light Rail Transit 1 and the soon-to-rise MRT-7. The structure’s total area is almost double than the 2009 plan, at 13,700 square meters.

The project is expected to be completed by April 2019, ensuring commuters a seamless transfer between the train stations. –Jovic Yee, CBB

 

Disclaimer: The comments uploaded on this site do not necessarily represent or reflect the views of management and owner of Cebudailynews. We reserve the right to exclude comments that we deem to be inconsistent with our editorial standards.


Warning: include(/var/www/motioncars/inq2014/crowdylanding.php): Failed to open stream: No such file or directory in /var/www/motioncars/wp-content/themes/Motioncars/tpl2018/sidebar.php on line 82

Warning: include(): Failed opening '/var/www/motioncars/inq2014/crowdylanding.php' for inclusion (include_path='.:/usr/share/php') in /var/www/motioncars/wp-content/themes/Motioncars/tpl2018/sidebar.php on line 82